OUR PROJECTS
A unique selection of our recent scaffolding projects...
Our portfolio includes a selection of jobs demonstrating our expertise, adaptability and innovation in scaffolding practises across residential, commercial, new build and EWI projects. Working in collaboration with site and project managers, various trades and nearby businesses and residents, we tailor each job to align with project schedules whilst minimising disruption from start to finish.
To discuss your project or for a free, no-obligation quote, get in touch below.
Project:
NORWICH CATHEDRAL
MAINTENANCE | NORWICH SCHOOL, CATHEDRAL & CLOSE, 2021-24
Tech Scaffolding has frequently been enlisted to provide access for maintenance and repair works at Norwich Cathedral, Norwich School and the adjacent Cathedral Close. Given the city-centre location, high public footfall and school schedule, maintenance is typically conducted during holidays and half-term breaks to ensure the safety of pupils, tourists and the public. Our projects at these sites have included a variety of specialised scaffolds. Notable examples include an internal scaffold for floodlight maintenance in the main cathedral, a 10-lift access tower with a hoist for chimney flue replacements, and an extensive 7-lift tied scaffold with buttress for roof work. Each scaffold is carefully designed and erected to accommodate the unique demands of the tasks at hand while preserving the integrity of these heritage buildings, underpinning our commitment to safety, precision and respect for areas of historic importance.




Project:
FLANNELS, CHANTRY PLACE
SHOP FIT | NORWICH, 2024
Tech Scaffolding was commissioned to assist with the shop fit of Flannels' new luxury store in Chantry Place, Norwich. The project was completed within a strict and often changing schedule and included various internal scaffolding for multiple trades: a temporary staircase during the replacement of the existing one, multiple lift scaffolds for installing full-height mirrors in the main stairwell, a beam structure over the escalator void, and an access tower for pipework removal in a dry riser. The project required us to conduct work outside shopping centre hours to minimise disruption and ensure public health and safety.

Project:
EXTERNAL WALL INSULATION
VARIOUS COUNCILS | SUFFOLK & CAMBRIDGESHIRE, 2019-24
Tech Scaffolding is contracted by an External Wall Insulation (EWI) company to assist with ongoing council projects across Norfolk, Suffolk, and Cambridgeshire. These initiatives, funded by the government, aim to enhance energy efficiency and safety for both council housing and privately owned homes. Working on multiple properties and entire streets at a time, communication is key to remain on schedule and be readily available for trade-specific adaptations. Each project is conducted in strict accordance with health and safety guidelines, in collaboration with contractors, councils and energy providers.




Project:
ARCHITECTURAL SELF-BUILD
CONSTRUCTION | NORWICH, 2024
Tech Scaffolding was commissioned to assist with the shop fit of Flannels' new luxury store in Chantry Place, Norwich. The project was completed within a strict and often changing schedule and included various internal scaffolding for multiple trades: a temporary staircase during the replacement of the existing one, multiple lift scaffolds for installing full-height mirrors in the main stairwell, a beam structure over the escalator void, and an access tower for pipework removal in a dry riser. The project required us to conduct work outside shopping centre hours to minimise disruption and ensure public health and safety.